Capability
Article 6.2Cooperative approach· Bilateral|Article 6.4Mechanism activity· Centralised|ICVCMCCP-aligned· Integrity|ICROAEndorsement-ready· Voluntary|CORSIAPhase II eligible· Aviation|CAD TrustInteroperable· Federation|ISO 14064Aligned MRV· Quantification|ISO 14065Aligned VVB· Verification|ISO 17029Aligned assurance· Validation|GHG ProtocolScope 1/2/3· Inventory|CSRD · ESRS E1Disclosure-ready· Reporting|ISSB · IFRS S2Investor-grade· Reporting|Sentinel-1/2Continuous cadence· Earth obs|IPCC 2019Tier 2/3 capable· Methodology|Article 6.2Cooperative approach· Bilateral|Article 6.4Mechanism activity· Centralised|ICVCMCCP-aligned· Integrity|ICROAEndorsement-ready· Voluntary|CORSIAPhase II eligible· Aviation|CAD TrustInteroperable· Federation|ISO 14064Aligned MRV· Quantification|ISO 14065Aligned VVB· Verification|ISO 17029Aligned assurance· Validation|GHG ProtocolScope 1/2/3· Inventory|CSRD · ESRS E1Disclosure-ready· Reporting|ISSB · IFRS S2Investor-grade· Reporting|Sentinel-1/2Continuous cadence· Earth obs|IPCC 2019Tier 2/3 capable· Methodology|
Industry · INDUSTRY

Mining

Mine methane capture, electrification of haul fleets, tailings rehabilitation, and Scope 3 disclosure.

Carbon challenges

Where complexity sits in this sector.

  • 01Coal mine methane drainage quantification
  • 02Diesel displacement additionality
  • 03Closure and rehabilitation crediting
  • 04ICMM disclosure alignment
MRV integration

How CAS monitors, reports, and verifies.

  • MRV 01
    Continuous gas drainage flow monitoring
  • MRV 02
    Fleet telematics emissions tracking
  • MRV 03
    Satellite tailings monitoring
  • MRV 04
    Rehabilitation vegetation NDVI tracking
Compliance opportunity

Pathways to credit issuance and recognition.

Pathways under VCS, ACR, CDM AM0023, and corporate Scope 1 abatement programs.

VCSACRCDM AM0023ICMM